Featured Projects

Project: Toppan Barrier Film Plant

Griffin, GA - 104,000 SF

KBD Group is providing design-build services for a 104,000 SF manufacturing facility for Toppan USA, Inc. The structure will include single story tilt-up concrete with steel joists, metal decking, and mechanically fastened 45 mil TPO Roofing with rigid R-30 insulation. The building consists of Class 100,000 (ISO Class 8) cleanrooms, warehouse area, an office area, and a detached solvent storage building. This facility is being constructed on a 23 acre greenfield site.