Featured Projects

Project: BAE Systems, Port Union Bldg F

Hamilton, OH - 292,500 SF

KBD Group provided General Contracting services for a 292,500 SF tenant fit-out for Armor Holdings. Armor Holdings is an aerospace and defense group acquired by BAE Systems. The scope of work included the construction of offices and warehouse improvements to accommodate the assembly and fit-out operations of MRAP Caiman tactical vehicles being sent to U.S. Military forces is Afghanistan and Iraq. Warehouse improvements included the design and installation of Optic Sensor Systems with infrared beam detection of smoke and vapors generated in the fit-out process. The Optic Sensor System controls were integrated with building exhaust fans to regulate air quality, temperature, and pressurization requirements.